Upper rail welding done

The fall weather was excellent and Saturday is a day for welding.  This was a to clear an item from the to-do list.  The upper rail joints looked like this one, on partially welded.

My best joint was probably this one, which looks almost respectable.  The others aren't nearly as photogenic.

To-do's before the first flight are now:

  1. finish weld the upper rail to the vertical supports
  2. do a weight & balance
  3. do a very thorough pre-flight check
  4. acquire radios (need 1x in car, 1x airborne)

Deferred:

  • finish weld trailer frame joints
  • wing root kiss seal
  • leather patch on wing tips where they rub the ground
  • leather patch guides for elevator control lines
  • trim color paint
  • main strut fairings
  • jury strut fairings
  • emergency parachute
  • drogue chute
  • variometer

 