The rain gave way to sunshine (and humidity), so I finished the first coat of paint on the trailer deck. It's very grey. I like it!
The guide tubes for the tow release line have been bonded onto the nose tube. I made a simple tee for a pull handle.
To-do's before the first flight are now:
- figure out how all of Goat parts transport together
- take all of Goat for its first trip around the neighborhood
- finish weld the upper rail to the vertical supports -- need Argon
- finish weld the frame joints -- need Argon
UV paint on the plywood decking -- partial first coat, second coat is neededglue tow release line tubes to nose tube- do a very thorough pre-flight check
- do a weight & balance
- get radios -- need 1x airborne, 1x in car
Deferred until after the first-flight:
- leather patch to wing tips where will rub the ground
- leather patch guides for elevator control lines
- trim color paint
- wing root kiss seal
- main strut fairings
- jury strut fairings
- emergency parachute
- drogue chute
- variometer
No comments:
Post a Comment