Digging up the old to-do list from 2016, what else is accomplished that wasn't done back then, and what else is on the list?
Nose:
- DONE make a nose skid (G4N10)
- change control stick axis bolt to drilled with cotter pin (will have to remove the torque tube)
- sidewalls in forward nose section (G4N13)
- DONE replace lower horizontal strut to tail connection bolt with a longer one
- DONE check all bolts are appropriate grip lengths
- DONE LATER find/make draw-string baggie for protecting the control cables during transport
- DONE glass the ribs to LE and TE
- DONE leading edge shell (G4S9)
- stiffener for aileron control line
- DONE 2019 foam blocks on the lower wing surface for covering support at the compression struts? I think Yando Goat did this.
- DONE wrap every pulley with tape and heat shrink to hold stiff and straight
- DONE check every quick pin for elastic retainers are both present and correct length (several are just singles)
- threadlock on every quick-link
- DONE 2019 covering reinforcement patches
- DONE 2019 painting
- DONE LATER mount the airspeed sensor to the forward nose tube
- DONE covering and adhesive
- DONE (1x) 1/8" SS quick-link
- radio (walkie-talkies of some variety)
- tow line
Other:
- reassemble the trailer
- extend the trailer tongue
- make a platform/box for the trailer to carry Goat
- set up a car for towing (hitch + wiring)
- DONE 2021 tags for the trailer (inspection??)
- DONE 2021 sort out a car towing arrangement
- find a place to fly
Uhg.
No comments:
Post a Comment