Monday, November 23, 2009

It's riveting work .......

The Simpsons was back on tonight! I broke into that Christmas order a bit early ... I split a tube to make sleeves for the upper and lower vertical stabilizer tubes. Since the long tubes have inserts with rivets, I thought that would be a fun way to spend the evening. I have to get to DC to do the rest of the alignment before making holes in the others ends ... something about alignment, heh. I also have another half-dozen brackets to make before I do that alignment step. Good thing the Thanksgiving holiday is upcoming :-)

1 comment:

Alan Beavis said...

For quicklinks try here.
http://www.berkeleypoint.com/products/hardware/quicklink_metric.html

Locations of visitors to this page